| Saltport | Virexal (R7) | 1,969 | 722 | 8825 | 24.613/hr | 2026-11-21 00:16 | ||
| Hex and Highwater Port | Virexal (R7) | 8,288 | 633,954 | 189270 | 331.52/hr | 2026-11-29 20:38 | ||
| Luminite Falls | Virexal (R7) | 2,648 | 75,622 | 36514 | 52.96/hr | 2026-12-04 19:11 | ||
| Hex Dredging Cooperative | Virexal (R7) | 1,241 | 4,678 | 12895 | 15.513/hr | 2026-12-10 16:59 | ||
| Highshine Quarry | Virexal (R7) | 817 | 26,834 | 47391 | 8.17/hr | 2027-07-05 18:19 |