| Saltport | Virexal (R7) | 1,969 | 722 | 8875 | 24.613/hr | 2026-11-21 00:30 | ||
| Hex and Highwater Port | Virexal (R7) | 8,288 | 632,349 | 189934 | 331.52/hr | 2026-11-29 20:50 | ||
| Luminite Falls | Virexal (R7) | 2,648 | 75,591 | 36620 | 52.96/hr | 2026-12-04 19:23 | ||
| Hex Dredging Cooperative | Virexal (R7) | 1,241 | 4,678 | 12927 | 15.513/hr | 2026-12-10 17:14 | ||
| Highshine Quarry | Virexal (R7) | 817 | 26,834 | 47407 | 8.17/hr | 2027-07-05 18:29 |